Cost Breakdown
Name/Model: Fennec FEC-5CM
Technology: Inner Sphere (Mixed)
Tonnage: 55
Configuration: Biped BattleMech
=========================================================================================================================
Structural Cost
-------------------------------------------------------------------------------------------------------------------------
Armor (Ferro-Fibrous): (170 pts) 9.5 x 20,000 190,000.00
Internal Structure (Endo-Composite): 55 x 3,200 x 1 (+) 176,000.00 = 366,000.00
Myomer (Standard): 55 x 2,000 (+) 110,000.00 = 476,000.00
Engine (XXL): (100,000 x 275 x 55) / 75 (+) 20,166,666.67 = 20,642,666.67
Gyro (Standard): 3.0 x 300,000 (+) 900,000.00 = 21,542,666.67
Cockpit (Standard): 200,000 (+) 200,000.00 = 21,742,666.67
Life Support: 50,000 (+) 50,000.00 = 21,792,666.67
Sensors: 55 x 2,000 (+) 110,000.00 = 21,902,666.67
Heat Sinks (Double): 11 x 6,000 (+) 66,000.00 = 21,968,666.67
Arm Actuators: 55 x ((100 x 2) + (50 x 0) + (80 x 0)) (+) 11,000.00 = 21,979,666.67
Leg Actuators: 55 x ((150 x 2) + (80 x 2) + (120 x 2)) (+) 38,500.00 = 22,018,166.67
-------------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 22,018,166.67
=========================================================================================================================
Weapons and Equipment Cost
-------------------------------------------------------------------------------------------------------------------------
C3 Boosted Master 3,000,000 3,000,000.00
ER Medium Laser (C) 80,000 (+) 80,000.00 = 3,080,000.00
ER Medium Laser (C) 80,000 (+) 80,000.00 = 3,160,000.00
Large Re-engineered Laser 250,000 (+) 250,000.00 = 3,410,000.00
Large Re-engineered Laser 250,000 (+) 250,000.00 = 3,660,000.00
Light Active Probe (C) 150,000 (+) 150,000.00 = 3,810,000.00
Radical Heat Sink System 250,000 (+) 250,000.00 = 4,060,000.00
-------------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 4,060,000.00
=========================================================================================================================
BattleMech Cost
-------------------------------------------------------------------------------------------------------------------------
Structural Cost: 22,018,166.67
Weapons and Equipment Cost: (+) 4,060,000.00 = 26,078,166.67
BattleMech Cost Multiplier: 1 + (55 / 100) (*) 1.55 = 40,421,158.33
-------------------------------------------------------------------------------------------------------------------------
Final BattleMech Cost 40,421,158.00
|