Cost Breakdown
Name/Model: Morrigu X
Technology: Clan (Mixed)
Tonnage: 80
Configuration: Tracked Combat Vehicle
=========================================================================================================
Structural Cost
---------------------------------------------------------------------------------------------------------
Armor (Heavy Ferro-Fibrous) (317 pts) 16.0 x 25,000 400,000.00
Internal Structure (Standard) 8.0 x 10,000 (+) 80,000.00 = 480,000.00
Control Components 4 x 10,000 (+) 40,000.00 = 520,000.00
Engine (XXL) (100,000 x 400 x 80) / 75 (+) 42,666,666.67 = 43,186,666.67
Heat Sinks (Single) 5 x 2,000 (+) 10,000.00 = 43,196,666.67
Turret 1.5 x 5,000 (+) 7,500.00 = 43,204,166.67
---------------------------------------------------------------------------------------------------------
Total Structural Cost 43,204,166.67
=========================================================================================================
Weapons and Equipment Cost
---------------------------------------------------------------------------------------------------------
ATM 12 350,000 350,000.00
ATM 12 (Ammo 5) [Empty Bin] 0 (+) 0.00 = 350,000.00
ATM 12 (Ammo 5) [Empty Bin] 0 (+) 0.00 = 350,000.00
ATM 12 (Ammo 5) [ER] [Empty Bin] 0 (+) 0.00 = 350,000.00
ATM 12 (Ammo 5) [ER] [Empty Bin] 0 (+) 0.00 = 350,000.00
ATM 12 (Ammo 5) [HE] [Empty Bin] 0 (+) 0.00 = 350,000.00
CASE 1 x 50,000 (+) 50,000.00 = 400,000.00
ECM Suite 200,000 (+) 200,000.00 = 600,000.00
ER PPC 300,000 (+) 300,000.00 = 900,000.00
---------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 900,000.00
=========================================================================================================
Combat Vehicle Cost
---------------------------------------------------------------------------------------------------------
Structural Cost 43,204,166.67
Weapons and Equipment Cost (+) 900,000.00 = 44,104,166.67
Combat Vehicle Cost Multiplier 1 + (80 / 100) (*) 1.8 = 79,387,500.00
---------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 79,387,500.00
|