Cost Breakdown
Name/Model: Behemoth (Stone Rhino) FS
Technology: Inner Sphere
Tonnage: 100
Configuration: Biped BattleMech
==========================================================================================================================
Structural Cost
--------------------------------------------------------------------------------------------------------------------------
Armor (Standard): (288 pts) 18.0 x 10,000 180,000.00
Internal Structure (Endo-Composite): 100 x 3,200 x 1 (+) 320,000.00 = 500,000.00
Myomer (Standard): 100 x 2,000 (+) 200,000.00 = 700,000.00
Engine (XL): (20,000 x 300 x 100) / 75 (+) 8,000,000.00 = 8,700,000.00
Gyro (Standard): 3.0 x 300,000 (+) 900,000.00 = 9,600,000.00
Cockpit (Standard): 200,000 (+) 200,000.00 = 9,800,000.00
Life Support: 50,000 (+) 50,000.00 = 9,850,000.00
Sensors: 100 x 2,000 (+) 200,000.00 = 10,050,000.00
Heat Sinks (Double): 10 x 6,000 (+) 60,000.00 = 10,110,000.00
Arm Actuators: 100 x ((100 x 2) + (50 x 2) + (80 x 0)) (+) 30,000.00 = 10,140,000.00
Leg Actuators: 100 x ((150 x 2) + (80 x 2) + (120 x 2)) (+) 70,000.00 = 10,210,000.00
--------------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 10,210,000.00
==========================================================================================================================
Weapons and Equipment Cost
--------------------------------------------------------------------------------------------------------------------------
CASE II 175,000 175,000.00
CASE II 175,000 (+) 175,000.00 = 350,000.00
Gauss Rifle 300,000 (+) 300,000.00 = 650,000.00
Gauss Rifle 300,000 (+) 300,000.00 = 950,000.00
Gauss Rifle (Ammo 8) [Empty Bin] 0 (+) 0.00 = 950,000.00
Gauss Rifle (Ammo 8) [Empty Bin] 0 (+) 0.00 = 950,000.00
Gauss Rifle (Ammo 8) [Empty Bin] 0 (+) 0.00 = 950,000.00
Gauss Rifle (Ammo 8) [Empty Bin] 0 (+) 0.00 = 950,000.00
Jump Jets 100 x (3 x 3) x 200 (+) 180,000.00 = 1,130,000.00
Large Re-engineered Laser 250,000 (+) 250,000.00 = 1,380,000.00
Large Re-engineered Laser 250,000 (+) 250,000.00 = 1,630,000.00
Small X-Pulse Laser 31,000 (+) 31,000.00 = 1,661,000.00
--------------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 1,661,000.00
==========================================================================================================================
BattleMech Cost
--------------------------------------------------------------------------------------------------------------------------
Structural Cost: 10,210,000.00
Weapons and Equipment Cost: (+) 1,661,000.00 = 11,871,000.00
BattleMech Cost Multiplier: 1 + (100 / 100) (*) 2.00 = 23,742,000.00
--------------------------------------------------------------------------------------------------------------------------
Final BattleMech Cost 23,742,000.00
|