Cost Breakdown
Name/Model: Storm
Technology: Inner Sphere
Tonnage: 60
Configuration: Tracked Combat Vehicle
=======================================================================================================
Structural Cost
-------------------------------------------------------------------------------------------------------
Armor (Standard) (240 pts) 15.0 x 10,000 150,000.00
Internal Structure (Standard) 6.0 x 10,000 (+) 60,000.00 = 210,000.00
Control Components 3 x 10,000 (+) 30,000.00 = 240,000.00
Engine (Fusion) (5,000 x 180 x 60) / 75 (+) 720,000.00 = 960,000.00
Heat Sinks (Single) 10 x 2,000 (+) 20,000.00 = 980,000.00
Turret 1.5 x 5,000 (+) 7,500.00 = 987,500.00
-------------------------------------------------------------------------------------------------------
Total Structural Cost 987,500.00
=======================================================================================================
Weapons and Equipment Cost
-------------------------------------------------------------------------------------------------------
PPC 200,000 200,000.00
PPC 200,000 (+) 200,000.00 = 400,000.00
-------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 400,000.00
=======================================================================================================
Combat Vehicle Cost
-------------------------------------------------------------------------------------------------------
Structural Cost 987,500.00
Weapons and Equipment Cost (+) 400,000.00 = 1,387,500.00
Combat Vehicle Cost Multiplier 1 + (60 / 100) (*) 1.6 = 2,220,000.00
-------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 2,220,000.00
|