Cost Breakdown
Name/Model: Bulldog X
Technology: Inner Sphere
Tonnage: 60
Configuration: Wheeled Combat Vehicle
=========================================================================================================
Structural Cost
---------------------------------------------------------------------------------------------------------
Armor (Heavy Ferro-Fibrous) (228 pts) 11.5 x 25,000 287,500.00
Internal Structure (Standard) 6.0 x 10,000 (+) 60,000.00 = 347,500.00
Control Components 3 x 10,000 (+) 30,000.00 = 377,500.00
Engine (XL) (20,000 x 220 x 60) / 75 (+) 3,520,000.00 = 3,897,500.00
Heat Sinks (Single) 10 x 2,000 (+) 20,000.00 = 3,917,500.00
Turret 1.5 x 5,000 (+) 7,500.00 = 3,925,000.00
---------------------------------------------------------------------------------------------------------
Total Structural Cost 3,925,000.00
=========================================================================================================
Weapons and Equipment Cost
---------------------------------------------------------------------------------------------------------
Beagle Active Probe 200,000 200,000.00
Plasma Rifle 260,000 (+) 260,000.00 = 460,000.00
Plasma Rifle 260,000 (+) 260,000.00 = 720,000.00
Plasma Rifle (Ammo 10) [Empty Bin] 0 (+) 0.00 = 720,000.00
Plasma Rifle (Ammo 10) [Empty Bin] 0 (+) 0.00 = 720,000.00
Plasma Rifle (Ammo 10) [Empty Bin] 0 (+) 0.00 = 720,000.00
Plasma Rifle (Ammo 10) [Empty Bin] 0 (+) 0.00 = 720,000.00
Targeting Computer 3 x 10,000 (+) 30,000.00 = 750,000.00
---------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 750,000.00
=========================================================================================================
Combat Vehicle Cost
---------------------------------------------------------------------------------------------------------
Structural Cost 3,925,000.00
Weapons and Equipment Cost (+) 750,000.00 = 4,675,000.00
Combat Vehicle Cost Multiplier 1 + (60 / 200) (*) 1.3 = 6,077,500.00
---------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 6,077,500.00
|