Cost Breakdown
Name/Model: Pike Support Vehicle (XL_Heavy Cannons)
Technology: Inner Sphere (Mixed)
Tonnage: 60
Configuration: Tracked Combat Vehicle
=================================================================================================================
Structural Cost
-----------------------------------------------------------------------------------------------------------------
Armor (Heavy Ferro-Fibrous) (163 pts) 8.5 x 25,000 212,500.00
Internal Structure (Standard) 6.0 x 10,000 (+) 60,000.00 = 272,500.00
Control Components 3 x 10,000 (+) 30,000.00 = 302,500.00
Engine (XL) (20,000 x 180 x 60) / 75 (+) 2,880,000.00 = 3,182,500.00
Turret 3 x 5,000 (+) 15,000.00 = 3,197,500.00
-----------------------------------------------------------------------------------------------------------------
Total Structural Cost 3,197,500.00
=================================================================================================================
Weapons and Equipment Cost
-----------------------------------------------------------------------------------------------------------------
LB 10-X AC 400,000 400,000.00
LB 10-X AC 400,000 (+) 400,000.00 = 800,000.00
LB 10-X AC (Ammo 10) [Cluster] [Empty Bin] 0 (+) 0.00 = 800,000.00
LB 10-X AC (Ammo 10) [Empty Bin] 0 (+) 0.00 = 800,000.00
LB 10-X AC (Ammo 10) [Empty Bin] 0 (+) 0.00 = 800,000.00
PPC 200,000 (+) 200,000.00 = 1,000,000.00
SRM 4 (C) 60,000 (+) 60,000.00 = 1,060,000.00
SRM 4 (Ammo 25) [Empty Bin] (C) 0 (+) 0.00 = 1,060,000.00
-----------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 1,060,000.00
=================================================================================================================
Combat Vehicle Cost
-----------------------------------------------------------------------------------------------------------------
Structural Cost 3,197,500.00
Weapons and Equipment Cost (+) 1,060,000.00 = 4,257,500.00
Combat Vehicle Cost Multiplier 1 + (60 / 100) (*) 1.6 = 6,812,000.00
-----------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 6,812,000.00
|