Cost Breakdown
Name/Model: Brutus Assault Tank (SD) "Safety Dance"
Technology: Inner Sphere
Tonnage: 75
Configuration: Tracked Combat Vehicle
=============================================================================================================
Structural Cost
-------------------------------------------------------------------------------------------------------------
Armor (Ferro-Fibrous) (179 pts) 10.0 x 20,000 200,000.00
Internal Structure (Standard) 7.5 x 10,000 (+) 75,000.00 = 275,000.00
Control Components 4 x 10,000 (+) 40,000.00 = 315,000.00
Engine (Fusion) (5,000 x 225 x 75) / 75 (+) 1,125,000.00 = 1,440,000.00
Heat Sinks (Single) 2 x 2,000 (+) 4,000.00 = 1,444,000.00
Turret 2.5 x 5,000 (+) 12,500.00 = 1,456,500.00
-------------------------------------------------------------------------------------------------------------
Total Structural Cost 1,456,500.00
=============================================================================================================
Weapons and Equipment Cost
-------------------------------------------------------------------------------------------------------------
C3 Slave 250,000 250,000.00
CASE 50,000 (+) 50,000.00 = 300,000.00
Combat Vehicle Escape Pod 10,000 (+) 10,000.00 = 310,000.00
ER Large Laser 200,000 (+) 200,000.00 = 510,000.00
Guardian ECM Suite 200,000 (+) 200,000.00 = 710,000.00
Light Gauss Rifle 275,000 (+) 275,000.00 = 985,000.00
Light Gauss Rifle (Ammo 16) [Empty Bin] 0 (+) 0.00 = 985,000.00
LRM 10 100,000 (+) 100,000.00 = 1,085,000.00
LRM 10 (Ammo 12) [Empty Bin] 0 (+) 0.00 = 1,085,000.00
LRM 10 (Ammo 12) [Empty Bin] 0 (+) 0.00 = 1,085,000.00
Rocket Launcher 10 15,000 (+) 15,000.00 = 1,100,000.00
Rocket Launcher 10 15,000 (+) 15,000.00 = 1,115,000.00
Rocket Launcher 10 15,000 (+) 15,000.00 = 1,130,000.00
Rocket Launcher 10 15,000 (+) 15,000.00 = 1,145,000.00
-------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 1,145,000.00
=============================================================================================================
Combat Vehicle Cost
-------------------------------------------------------------------------------------------------------------
Structural Cost 1,456,500.00
Weapons and Equipment Cost (+) 1,145,000.00 = 2,601,500.00
Combat Vehicle Cost Multiplier 1 + (75 / 100) (*) 1.75 = 4,552,625.00
-------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 4,552,625.00
|