Cost Breakdown
Name/Model: Alacorn Heavy Tank (SD) "Safety Dance"
Technology: Inner Sphere (Mixed)
Tonnage: 95
Configuration: Tracked Combat Vehicle
===================================================================================================================
Structural Cost
-------------------------------------------------------------------------------------------------------------------
Armor (Ferro-Fibrous) (224 pts) 12.5 x 20,000 250,000.00
Internal Structure (Standard) 9.5 x 10,000 (+) 95,000.00 = 345,000.00
Control Components 5 x 10,000 (+) 50,000.00 = 395,000.00
Engine (Fusion) (5,000 x 285 x 95) / 75 (+) 1,805,000.00 = 2,200,000.00
Heat Sinks (Single) 2 x 2,000 (+) 4,000.00 = 2,204,000.00
Turret 3 x 5,000 (+) 15,000.00 = 2,219,000.00
-------------------------------------------------------------------------------------------------------------------
Total Structural Cost 2,219,000.00
===================================================================================================================
Weapons and Equipment Cost
-------------------------------------------------------------------------------------------------------------------
Anti-Missile System (C) 100,000 100,000.00
Anti-Missile System (Ammo 24) [Empty Bin] (C) 0 (+) 0.00 = 100,000.00
CASE 50,000 (+) 50,000.00 = 150,000.00
Combat Vehicle Escape Pod 10,000 (+) 10,000.00 = 160,000.00
ECM Suite (C) 200,000 (+) 200,000.00 = 360,000.00
ER Large Laser (C) 200,000 (+) 200,000.00 = 560,000.00
Gauss Rifle (C) 300,000 (+) 300,000.00 = 860,000.00
Gauss Rifle (C) 300,000 (+) 300,000.00 = 1,160,000.00
Gauss Rifle (Ammo 8) [Empty Bin] (C) 0 (+) 0.00 = 1,160,000.00
Gauss Rifle (Ammo 8) [Empty Bin] (C) 0 (+) 0.00 = 1,160,000.00
Gauss Rifle (Ammo 8) [Empty Bin] (C) 0 (+) 0.00 = 1,160,000.00
-------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 1,160,000.00
===================================================================================================================
Combat Vehicle Cost
-------------------------------------------------------------------------------------------------------------------
Structural Cost 2,219,000.00
Weapons and Equipment Cost (+) 1,160,000.00 = 3,379,000.00
Combat Vehicle Cost Multiplier 1 + (95 / 100) (*) 1.95 = 6,589,050.00
-------------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 6,589,050.00
|