Cost Breakdown
Name/Model: MIT 23 MASH Vehicle
Technology: Inner Sphere
Tonnage: 20
Configuration: Wheeled Combat Vehicle
======================================================================================================
Structural Cost
------------------------------------------------------------------------------------------------------
Armor (Standard) (56 pts) 3.5 x 10,000 35,000.00
Internal Structure (Standard) 2.0 x 10,000 (+) 20,000.00 = 55,000.00
Control Components 1 x 10,000 (+) 10,000.00 = 65,000.00
Engine (Fusion) (5,000 x 80 x 20) / 75 (+) 106,666.67 = 171,666.67
------------------------------------------------------------------------------------------------------
Total Structural Cost 171,666.67
======================================================================================================
Weapons and Equipment Cost
------------------------------------------------------------------------------------------------------
MASH Equipment (Core) 35,000 35,000.00
MASH Equipment (Theater) 10,000 (+) 10,000.00 = 45,000.00
MASH Equipment (Theater) 10,000 (+) 10,000.00 = 55,000.00
MASH Equipment (Theater) 10,000 (+) 10,000.00 = 65,000.00
MASH Equipment (Theater) 10,000 (+) 10,000.00 = 75,000.00
MASH Equipment (Theater) 10,000 (+) 10,000.00 = 85,000.00
MASH Equipment (Theater) 10,000 (+) 10,000.00 = 95,000.00
------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 95,000.00
======================================================================================================
Combat Vehicle Cost
------------------------------------------------------------------------------------------------------
Structural Cost 171,666.67
Weapons and Equipment Cost (+) 95,000.00 = 266,666.67
Combat Vehicle Cost Multiplier 1 + (20 / 200) (*) 1.1 = 293,333.33
------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 293,333.00
|