Cost Breakdown
Name/Model: Hardshot IIC 8
Technology: Clan
Tonnage: 100
Configuration: Tracked Combat Vehicle
===================================================================================================================
Structural Cost
-------------------------------------------------------------------------------------------------------------------
Armor (Ferro-Fibrous) (345 pts) 18.0 x 20,000 360,000.00
Internal Structure (Standard) 10.0 x 10,000 (+) 100,000.00 = 460,000.00
Control Components 5 x 10,000 (+) 50,000.00 = 510,000.00
Engine (XL) (20,000 x 300 x 100) / 75 (+) 8,000,000.00 = 8,510,000.00
Heat Sinks (Single) 14 x 2,000 (+) 28,000.00 = 8,538,000.00
Turret 2.5 x 5,000 (+) 12,500.00 = 8,550,500.00
-------------------------------------------------------------------------------------------------------------------
Total Structural Cost 8,550,500.00
===================================================================================================================
Weapons and Equipment Cost
-------------------------------------------------------------------------------------------------------------------
ATM 12 350,000 350,000.00
ATM 12 (Ammo 5) [Empty Bin] 0 (+) 0.00 = 350,000.00
ATM 12 (Ammo 5) [ER] [Empty Bin] 0 (+) 0.00 = 350,000.00
ATM 12 (Ammo 5) [HE] [Empty Bin] 0 (+) 0.00 = 350,000.00
CASE 2 x 50,000 (+) 100,000.00 = 450,000.00
ER Large Laser 200,000 (+) 200,000.00 = 650,000.00
ER Large Laser 200,000 (+) 200,000.00 = 850,000.00
Hyper-Assault Gauss 20 400,000 (+) 400,000.00 = 1,250,000.00
Hyper-Assault Gauss 20 (Ammo 6) [Empty Bin] 0 (+) 0.00 = 1,250,000.00
Hyper-Assault Gauss 20 (Ammo 6) [Empty Bin] 0 (+) 0.00 = 1,250,000.00
Ultra AC/2 120,000 (+) 120,000.00 = 1,370,000.00
Ultra AC/2 (Ammo 45) [Empty Bin] 0 (+) 0.00 = 1,370,000.00
-------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 1,370,000.00
===================================================================================================================
Combat Vehicle Cost
-------------------------------------------------------------------------------------------------------------------
Structural Cost 8,550,500.00
Weapons and Equipment Cost (+) 1,370,000.00 = 9,920,500.00
Combat Vehicle Cost Multiplier 1 + (100 / 100) (*) 2 = 19,841,000.00
-------------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 19,841,000.00
|