Cost Breakdown
Name/Model: LB-10 Carrier
Technology: Inner Sphere
Tonnage: 90
Configuration: Tracked Combat Vehicle
==================================================================================================================
Structural Cost
------------------------------------------------------------------------------------------------------------------
Armor (Heavy Ferro-Fibrous) (178 pts) 9.0 x 25,000 225,000.00
Internal Structure (Standard) 9.0 x 10,000 (+) 90,000.00 = 315,000.00
Control Components 4.5 x 10,000 (+) 45,000.00 = 360,000.00
Engine (XXL) (100,000 x 360 x 90) / 75 (+) 43,200,000.00 = 43,560,000.00
------------------------------------------------------------------------------------------------------------------
Total Structural Cost 43,560,000.00
==================================================================================================================
Weapons and Equipment Cost
------------------------------------------------------------------------------------------------------------------
LB 10-X AC 400,000 400,000.00
LB 10-X AC 400,000 (+) 400,000.00 = 800,000.00
LB 10-X AC 400,000 (+) 400,000.00 = 1,200,000.00
LB 10-X AC 400,000 (+) 400,000.00 = 1,600,000.00
LB 10-X AC (Ammo 10) [Cluster] [Empty Bin] 0 (+) 0.00 = 1,600,000.00
LB 10-X AC (Ammo 10) [Cluster] [Empty Bin] 0 (+) 0.00 = 1,600,000.00
LB 10-X AC (Ammo 10) [Cluster] [Empty Bin] 0 (+) 0.00 = 1,600,000.00
LB 10-X AC (Ammo 10) [Empty Bin] 0 (+) 0.00 = 1,600,000.00
LB 10-X AC (Ammo 10) [Empty Bin] 0 (+) 0.00 = 1,600,000.00
LB 10-X AC (Ammo 10) [Empty Bin] 0 (+) 0.00 = 1,600,000.00
Small Pulse Laser 16,000 (+) 16,000.00 = 1,616,000.00
------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 1,616,000.00
==================================================================================================================
Combat Vehicle Cost
------------------------------------------------------------------------------------------------------------------
Structural Cost 43,560,000.00
Weapons and Equipment Cost (+) 1,616,000.00 = 45,176,000.00
Combat Vehicle Cost Multiplier 1 + (90 / 100) (*) 1.9 = 85,834,400.00
------------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 85,834,400.00
|