Cost Breakdown
Name/Model: Patton (Ferro-Lamellor)
Technology: Inner Sphere (Mixed)
Tonnage: 65
Configuration: Tracked Combat Vehicle
==============================================================================================================================
Structural Cost
------------------------------------------------------------------------------------------------------------------------------
Armor (Ferro-Lamellor) (224 pts) 16.0 x 35,000 560,000.00
Internal Structure (Standard) 6.5 x 10,000 (+) 65,000.00 = 625,000.00
Control Components 3.5 x 10,000 (+) 35,000.00 = 660,000.00
Engine (Fuel Cell) (3,500 x 260 x 65) / 75 (+) 788,666.67 = 1,448,666.67
Heat Sinks (Single) 1 x 2,000 (+) 2,000.00 = 1,450,666.67
Turret 1.5 x 5,000 (+) 7,500.00 = 1,458,166.67
------------------------------------------------------------------------------------------------------------------------------
Total Structural Cost 1,458,166.67
==============================================================================================================================
Weapons and Equipment Cost
------------------------------------------------------------------------------------------------------------------------------
CASE (C) 1 x 50,000 50,000.00
LB 10-X AC (C) 400,000 (+) 400,000.00 = 450,000.00
LB 10-X AC (Ammo 10) [Cluster] [Empty Bin] (C) 0 (+) 0.00 = 450,000.00
LB 10-X AC (Ammo 10) [Empty Bin] (C) 0 (+) 0.00 = 450,000.00
Light Machine Gun 5,000 (+) 5,000.00 = 455,000.00
Light Machine Gun 5,000 (+) 5,000.00 = 460,000.00
Light Machine Gun (Ammo 100) [Empty Bin] 0 (+) 0.00 = 460,000.00
LRM 10 (C) 100,000 (+) 100,000.00 = 560,000.00
LRM 10 (Ammo 12) [Empty Bin] (C) 0 (+) 0.00 = 560,000.00
RISC Advanced Point Defense System 200,000 (+) 200,000.00 = 760,000.00
RISC Advanced Point Defense System (Ammo 12) [Empty Bin] 0 (+) 0.00 = 760,000.00
------------------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 760,000.00
==============================================================================================================================
Combat Vehicle Cost
------------------------------------------------------------------------------------------------------------------------------
Structural Cost 1,458,166.67
Weapons and Equipment Cost (+) 760,000.00 = 2,218,166.67
Combat Vehicle Cost Multiplier 1 + (65 / 100) (*) 1.65 = 3,659,975.00
------------------------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 3,659,975.00
|