Cost Breakdown
Name/Model: Elaina MK I
Technology: Clan
Tonnage: 25
Configuration: Tracked Combat Vehicle
===============================================================================================================
Structural Cost
---------------------------------------------------------------------------------------------------------------
Armor (Ferro-Fibrous) (94 pts) 5.0 x 20,000 100,000.00
Internal Structure (Standard) 2.5 x 10,000 (+) 25,000.00 = 125,000.00
Control Components 1.5 x 10,000 (+) 15,000.00 = 140,000.00
Engine (Fusion) (5,000 x 100 x 25) / 75 (+) 166,666.67 = 306,666.67
Turret 1 x 5,000 (+) 5,000.00 = 311,666.67
---------------------------------------------------------------------------------------------------------------
Total Structural Cost 311,666.67
===============================================================================================================
Weapons and Equipment Cost
---------------------------------------------------------------------------------------------------------------
CASE 1 x 50,000 50,000.00
ER Medium Laser 80,000 (+) 80,000.00 = 130,000.00
LB 5-X AC 250,000 (+) 250,000.00 = 380,000.00
LB 5-X AC (Ammo 20) [Cluster] [Empty Bin] 0 (+) 0.00 = 380,000.00
---------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 380,000.00
===============================================================================================================
Combat Vehicle Cost
---------------------------------------------------------------------------------------------------------------
Structural Cost 311,666.67
Weapons and Equipment Cost (+) 380,000.00 = 691,666.67
Combat Vehicle Cost Multiplier 1 + (25 / 100) (*) 1.25 = 864,583.33
---------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 864,583.00
|