Cost Breakdown
Name/Model: Hetzer Wheeled Assault Gun C (Fuel Cell)
Technology: Clan
Tonnage: 40
Configuration: Wheeled Combat Vehicle
=================================================================================================================
Structural Cost
-----------------------------------------------------------------------------------------------------------------
Armor (Ferro-Fibrous) (143 pts) 7.5 x 20,000 150,000.00
Internal Structure (Standard) 4.0 x 10,000 (+) 40,000.00 = 190,000.00
Control Components 2 x 10,000 (+) 20,000.00 = 210,000.00
Engine (Fuel Cell) (3,500 x 180 x 40) / 75 (+) 336,000.00 = 546,000.00
Heat Sinks (Single) 1 x 2,000 (+) 2,000.00 = 548,000.00
-----------------------------------------------------------------------------------------------------------------
Total Structural Cost 548,000.00
=================================================================================================================
Weapons and Equipment Cost
-----------------------------------------------------------------------------------------------------------------
CASE 1 x 50,000 50,000.00
Hyper-Assault Gauss 30 500,000 (+) 500,000.00 = 550,000.00
Hyper-Assault Gauss 30 (Ammo 4) [Empty Bin] 0 (+) 0.00 = 550,000.00
Hyper-Assault Gauss 30 (Ammo 4) [Empty Bin] 0 (+) 0.00 = 550,000.00
Hyper-Assault Gauss 30 (Ammo 4) [Empty Bin] 0 (+) 0.00 = 550,000.00
Hyper-Assault Gauss 30 (Ammo 4) [Empty Bin] 0 (+) 0.00 = 550,000.00
Hyper-Assault Gauss 30 (Ammo 4) [Empty Bin] 0 (+) 0.00 = 550,000.00
-----------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 550,000.00
=================================================================================================================
Combat Vehicle Cost
-----------------------------------------------------------------------------------------------------------------
Structural Cost 548,000.00
Weapons and Equipment Cost (+) 550,000.00 = 1,098,000.00
Combat Vehicle Cost Multiplier 1 + (40 / 200) (*) 1.2 = 1,317,600.00
-----------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 1,317,600.00
|