Cost Breakdown
Name/Model: Demolisher Pirate
Technology: Inner Sphere
Tonnage: 80
Configuration: Tracked Combat Vehicle
========================================================================================================
Structural Cost
--------------------------------------------------------------------------------------------------------
Armor (Standard) (120 pts) 7.5 x 10,000 75,000.00
Internal Structure (Standard) 8.0 x 10,000 (+) 80,000.00 = 155,000.00
Control Components 4 x 10,000 (+) 40,000.00 = 195,000.00
Engine (Internal Combustion) (1,250 x 240 x 80) / 75 (+) 320,000.00 = 515,000.00
Turret 3 x 5,000 (+) 15,000.00 = 530,000.00
--------------------------------------------------------------------------------------------------------
Total Structural Cost 530,000.00
========================================================================================================
Weapons and Equipment Cost
--------------------------------------------------------------------------------------------------------
Heavy Rifle 90,000 90,000.00
Heavy Rifle 90,000 (+) 90,000.00 = 180,000.00
Heavy Rifle 90,000 (+) 90,000.00 = 270,000.00
Heavy Rifle (Ammo 6) [Empty Bin] 0 (+) 0.00 = 270,000.00
Heavy Rifle (Ammo 6) [Empty Bin] 0 (+) 0.00 = 270,000.00
Machine Gun 5,000 (+) 5,000.00 = 275,000.00
Machine Gun 5,000 (+) 5,000.00 = 280,000.00
Machine Gun 5,000 (+) 5,000.00 = 285,000.00
Machine Gun 5,000 (+) 5,000.00 = 290,000.00
Machine Gun (Ammo 100) [Empty Bin] 0 (+) 0.00 = 290,000.00
Medium Rifle 75,500 (+) 75,500.00 = 365,500.00
Medium Rifle (Ammo 9) [Empty Bin] 0 (+) 0.00 = 365,500.00
--------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 365,500.00
========================================================================================================
Combat Vehicle Cost
--------------------------------------------------------------------------------------------------------
Structural Cost 530,000.00
Weapons and Equipment Cost (+) 365,500.00 = 895,500.00
Combat Vehicle Cost Multiplier 1 + (80 / 100) (*) 1.8 = 1,611,900.00
--------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 1,611,900.00
|