Cost Breakdown
Name/Model: Breakwater Heavy Combat Platform Model No. 115
Technology: Inner Sphere
Tonnage: 75
Configuration: Tracked Combat Vehicle
================================================================================================================
Structural Cost
----------------------------------------------------------------------------------------------------------------
Armor (Heavy Ferro-Fibrous) (302 pts) 15.5 x 25,000 387,500.00
Internal Structure (Standard) 7.5 x 10,000 (+) 75,000.00 = 462,500.00
Control Components 4 x 10,000 (+) 40,000.00 = 502,500.00
Engine (Fuel Cell) (3,500 x 225 x 75) / 75 (+) 787,500.00 = 1,290,000.00
Heat Sinks (Single) 2 x 2,000 (+) 4,000.00 = 1,294,000.00
Turret 3 x 5,000 (+) 15,000.00 = 1,309,000.00
Power Amplifiers 0.5 x 20,000 (+) 10,000.00 = 1,319,000.00
----------------------------------------------------------------------------------------------------------------
Total Structural Cost 1,319,000.00
================================================================================================================
Weapons and Equipment Cost
----------------------------------------------------------------------------------------------------------------
Gauss Rifle 300,000 300,000.00
Gauss Rifle (Ammo 8) [Empty Bin] 0 (+) 0.00 = 300,000.00
Gauss Rifle (Ammo 8) [Empty Bin] 0 (+) 0.00 = 300,000.00
LB 10-X AC 400,000 (+) 400,000.00 = 700,000.00
LB 10-X AC (Ammo 10) [Cluster] [Empty Bin] 0 (+) 0.00 = 700,000.00
LB 10-X AC (Ammo 10) [Empty Bin] 0 (+) 0.00 = 700,000.00
Small Pulse Laser 16,000 (+) 16,000.00 = 716,000.00
----------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 716,000.00
================================================================================================================
Combat Vehicle Cost
----------------------------------------------------------------------------------------------------------------
Structural Cost 1,319,000.00
Weapons and Equipment Cost (+) 716,000.00 = 2,035,000.00
Combat Vehicle Cost Multiplier 1 + (75 / 100) (*) 1.75 = 3,561,250.00
----------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 3,561,250.00
|