Cost Breakdown
Name/Model: Hetzer (LB10X-B)
Technology: Inner Sphere
Tonnage: 40
Configuration: Tracked Combat Vehicle
================================================================================================================
Structural Cost
----------------------------------------------------------------------------------------------------------------
Armor (Standard) (128 pts) 8.0 x 10,000 80,000.00
Internal Structure (Standard) 4.0 x 10,000 (+) 40,000.00 = 120,000.00
Control Components 2 x 10,000 (+) 20,000.00 = 140,000.00
Engine (Fusion) (5,000 x 200 x 40) / 75 (+) 533,333.33 = 673,333.33
----------------------------------------------------------------------------------------------------------------
Total Structural Cost 673,333.33
================================================================================================================
Weapons and Equipment Cost
----------------------------------------------------------------------------------------------------------------
LB 10-X AC 400,000 400,000.00
LB 10-X AC (Ammo 10) [Cluster] [Empty Bin] 0 (+) 0.00 = 400,000.00
LB 10-X AC (Ammo 10) [Empty Bin] 0 (+) 0.00 = 400,000.00
----------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 400,000.00
================================================================================================================
Combat Vehicle Cost
----------------------------------------------------------------------------------------------------------------
Structural Cost 673,333.33
Weapons and Equipment Cost (+) 400,000.00 = 1,073,333.33
Combat Vehicle Cost Multiplier 1 + (40 / 100) (*) 1.4 = 1,502,666.67
----------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 1,502,667.00
|