Cost Breakdown
Name/Model: Kinnol MBT
Technology: Inner Sphere
Tonnage: 70
Configuration: Tracked Combat Vehicle
=================================================================================================================
Structural Cost
-----------------------------------------------------------------------------------------------------------------
Armor (Ferro-Fibrous) (215 pts) 12.0 x 20,000 240,000.00
Internal Structure (Standard) 7.0 x 10,000 (+) 70,000.00 = 310,000.00
Control Components 3.5 x 10,000 (+) 35,000.00 = 345,000.00
Engine (XL) (20,000 x 350 x 70) / 75 (+) 6,533,333.33 = 6,878,333.33
Turret 1.5 x 5,000 (+) 7,500.00 = 6,885,833.33
-----------------------------------------------------------------------------------------------------------------
Total Structural Cost 6,885,833.33
=================================================================================================================
Weapons and Equipment Cost
-----------------------------------------------------------------------------------------------------------------
CASE 50,000 50,000.00
ER Medium Laser 80,000 (+) 80,000.00 = 130,000.00
LB 10-X AC 400,000 (+) 400,000.00 = 530,000.00
LB 10-X AC (Ammo 10) [Cluster] [Empty Bin] 0 (+) 0.00 = 530,000.00
LB 10-X AC (Ammo 10) [Empty Bin] 0 (+) 0.00 = 530,000.00
MML 5 75,000 (+) 75,000.00 = 605,000.00
MML 5 75,000 (+) 75,000.00 = 680,000.00
MML 5 (Ammo 20) [SRM] [Empty Bin] 0 (+) 0.00 = 680,000.00
MML 5 (Ammo 24) [LRM] [Empty Bin] 0 (+) 0.00 = 680,000.00
MML 5 (Ammo 24) [LRM] [Empty Bin] 0 (+) 0.00 = 680,000.00
-----------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 680,000.00
=================================================================================================================
Combat Vehicle Cost
-----------------------------------------------------------------------------------------------------------------
Structural Cost 6,885,833.33
Weapons and Equipment Cost (+) 680,000.00 = 7,565,833.33
Combat Vehicle Cost Multiplier 1 + (70 / 100) (*) 1.7 = 12,861,916.67
-----------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 12,861,917.00
|