Cost Breakdown
Name/Model: Untitled
Technology: Inner Sphere
Tonnage: 50
Configuration: Biped BattleMech
================================================================================================================================
Structural Cost
--------------------------------------------------------------------------------------------------------------------------------
Armor (Ferro-Fibrous): (161 pts) 9.0 x 20,000 180,000.00
Internal Structure (Standard): 50 x 400 x 1 (+) 20,000.00 = 200,000.00
Myomer (Standard): 50 x 2,000 (+) 100,000.00 = 300,000.00
Engine (XL): (20,000 x 250 x 50) / 75 (+) 3,333,333.33 = 3,633,333.33
Gyro (Standard): 3.0 x 300,000 (+) 900,000.00 = 4,533,333.33
Cockpit (Standard): 200,000 (+) 200,000.00 = 4,733,333.33
Life Support: 50,000 (+) 50,000.00 = 4,783,333.33
Sensors: 50 x 2,000 (+) 100,000.00 = 4,883,333.33
Heat Sinks (Single): 2 x 2,000 (+) 4,000.00 = 4,887,333.33
Arm Actuators: 50 x ((100 x 2) + (50 x 2) + (80 x 0)) (+) 15,000.00 = 4,902,333.33
Leg Actuators: 50 x ((150 x 2) + (80 x 2) + (120 x 2)) (+) 35,000.00 = 4,937,333.33
--------------------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 4,937,333.33
================================================================================================================================
Weapons and Equipment Cost
--------------------------------------------------------------------------------------------------------------------------------
CASE 50,000 50,000.00
ER Large Laser 200,000 (+) 200,000.00 = 250,000.00
Jump Jets 50 x (5 x 5) x 200 (+) 250,000.00 = 500,000.00
LB 10-X AC 400,000 (+) 400,000.00 = 900,000.00
LB 10-X AC (Ammo 10) [Cluster] [Empty Bin] 0 (+) 0.00 = 900,000.00
LB 10-X AC (Ammo 10) [Empty Bin] 0 (+) 0.00 = 900,000.00
Small Laser 11,250 (+) 11,250.00 = 911,250.00
--------------------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 911,250.00
================================================================================================================================
BattleMech Cost
--------------------------------------------------------------------------------------------------------------------------------
Structural Cost: 4,937,333.33
Weapons and Equipment Cost: (+) 911,250.00 = 5,848,583.33
BattleMech Cost Multiplier: 1 + (50 / 100) (*) 1.50 = 8,772,875.00
--------------------------------------------------------------------------------------------------------------------------------
Final BattleMech Cost 8,772,875.00
|