Cost Breakdown
Name/Model:         Gunt Master CCL
Technology:         Inner Sphere
Tonnage:            60
Configuration:      Tracked Combat Vehicle
=================================================================================================================
Structural Cost
-----------------------------------------------------------------------------------------------------------------
  Armor (Standard)                            (248 pts) 15.5 x 10,000              155,000.00                    
  Internal Structure (Standard)               6.0 x 10,000              (+)         60,000.00  =       215,000.00
  Control Components                          3 x 10,000                (+)         30,000.00  =       245,000.00
  Engine (XL)                                 (20,000 x 300 x 60) / 75  (+)      4,800,000.00  =     5,045,000.00
  Turret                                      1.5 x 5,000               (+)          7,500.00  =     5,052,500.00
-----------------------------------------------------------------------------------------------------------------
Total Structural Cost                                                                                5,052,500.00
=================================================================================================================
Weapons and Equipment Cost
-----------------------------------------------------------------------------------------------------------------
  C3 Computer (Master)                        1,500,000                          1,500,000.00                    
  Guardian ECM Suite                          200,000                   (+)        200,000.00  =     1,700,000.00
  LB 10-X AC                                  400,000                   (+)        400,000.00  =     2,100,000.00
  LB 10-X AC (Ammo 10) [Cluster] [Empty Bin]  0                         (+)              0.00  =     2,100,000.00
  LB 10-X AC (Ammo 10) [Empty Bin]            0                         (+)              0.00  =     2,100,000.00
-----------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost                                                                     2,100,000.00
=================================================================================================================
Combat Vehicle Cost
-----------------------------------------------------------------------------------------------------------------
  Structural Cost                                                                5,052,500.00                    
  Weapons and Equipment Cost                                            (+)      2,100,000.00  =     7,152,500.00
  Combat Vehicle Cost Multiplier              1 + (60 / 100)            (*)               1.6  =    11,444,000.00
-----------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost                                                                           11,444,000.00
 
		 |