Cost Breakdown
Name/Model: Engineering Vehicle
Technology: Inner Sphere
Tonnage: 40
Configuration: Tracked Combat Vehicle
=======================================================================================================
Structural Cost
-------------------------------------------------------------------------------------------------------
Armor (Standard) (40 pts) 2.5 x 10,000 25,000.00
Internal Structure (Standard) 4.0 x 10,000 (+) 40,000.00 = 65,000.00
Control Components 2 x 10,000 (+) 20,000.00 = 85,000.00
Engine (Internal Combustion) (1,250 x 240 x 40) / 75 (+) 160,000.00 = 245,000.00
Turret 0.5 x 5,000 (+) 2,500.00 = 247,500.00
-------------------------------------------------------------------------------------------------------
Total Structural Cost 247,500.00
=======================================================================================================
Weapons and Equipment Cost
-------------------------------------------------------------------------------------------------------
Backhoe 50,000 50,000.00
Lift Hoist 50,000 (+) 50,000.00 = 100,000.00
-------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 100,000.00
=======================================================================================================
Combat Vehicle Cost
-------------------------------------------------------------------------------------------------------
Structural Cost 247,500.00
Weapons and Equipment Cost (+) 100,000.00 = 347,500.00
Combat Vehicle Cost Multiplier 1 + (40 / 100) (*) 1.4 = 486,500.00
-------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 486,500.00
|