Cost Breakdown
Name/Model:         Hare Hover CCL
Technology:         Inner Sphere
Tonnage:            35
Configuration:      Hover Combat Vehicle
========================================================================================================
Structural Cost
--------------------------------------------------------------------------------------------------------
  Armor (Standard)                    (162 pts) 10.5 x 10,000             105,000.00                    
  Internal Structure (Standard)       3.5 x 10,000             (+)         35,000.00  =       140,000.00
  Control Components                  2 x 10,000               (+)         20,000.00  =       160,000.00
  Lift/Dive Equipment                 3.5 x 20,000             (+)         70,000.00  =       230,000.00
  Engine (Fusion)                     (5,000 x 140 x 35) / 75  (+)        326,666.67  =       556,666.67
  Turret                              0.5 x 5,000              (+)          2,500.00  =       559,166.67
--------------------------------------------------------------------------------------------------------
Total Structural Cost                                                                         559,166.67
========================================================================================================
Weapons and Equipment Cost
--------------------------------------------------------------------------------------------------------
  Angel ECM Suite                     750,000                             750,000.00                    
  C3 Slave                            250,000                  (+)        250,000.00  =     1,000,000.00
  ER Medium Laser                     80,000                   (+)         80,000.00  =     1,080,000.00
  ER Medium Laser                     80,000                   (+)         80,000.00  =     1,160,000.00
  Streak SRM 2                        15,000                   (+)         15,000.00  =     1,175,000.00
  Streak SRM 2 (Ammo 50) [Empty Bin]  0                        (+)              0.00  =     1,175,000.00
--------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost                                                            1,175,000.00
========================================================================================================
Combat Vehicle Cost
--------------------------------------------------------------------------------------------------------
  Structural Cost                                                         559,166.67                    
  Weapons and Equipment Cost                                   (+)      1,175,000.00  =     1,734,166.67
  Combat Vehicle Cost Multiplier      1 + (35 / 50)            (*)               1.7  =     2,948,083.33
--------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost                                                                   2,948,083.00
 
		 |