Cost Breakdown
Name/Model: Super Tonk
Technology: Inner Sphere (Mixed)
Tonnage: 100
Configuration: Tracked Combat Vehicle
====================================================================================================================
Structural Cost
--------------------------------------------------------------------------------------------------------------------
Armor (Heavy Ferro-Fibrous) (337 pts) 17.0 x 25,000 425,000.00
Internal Structure (Standard) 10.0 x 10,000 (+) 100,000.00 = 525,000.00
Control Components 5 x 10,000 (+) 50,000.00 = 575,000.00
Engine (Fusion) (5,000 x 300 x 100) / 75 (+) 2,000,000.00 = 2,575,000.00
Turret 3 x 5,000 (+) 15,000.00 = 2,590,000.00
--------------------------------------------------------------------------------------------------------------------
Total Structural Cost 2,590,000.00
====================================================================================================================
Weapons and Equipment Cost
--------------------------------------------------------------------------------------------------------------------
LB 20-X AC (C) 600,000 600,000.00
LB 20-X AC (C) 600,000 (+) 600,000.00 = 1,200,000.00
LB 20-X AC (Ammo 5) [Cluster] [Empty Bin] (C) 0 (+) 0.00 = 1,200,000.00
LB 20-X AC (Ammo 5) [Cluster] [Empty Bin] (C) 0 (+) 0.00 = 1,200,000.00
LB 20-X AC (Ammo 5) [Empty Bin] (C) 0 (+) 0.00 = 1,200,000.00
LB 20-X AC (Ammo 5) [Empty Bin] (C) 0 (+) 0.00 = 1,200,000.00
SRM 6 (C) 80,000 (+) 80,000.00 = 1,280,000.00
SRM 6 (Ammo 15) [Smoke] [Empty Bin] (C) 0 (+) 0.00 = 1,280,000.00
Vehicular Jump Jets 100 x (3 x 3) x 200 (+) 180,000.00 = 1,460,000.00
--------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 1,460,000.00
====================================================================================================================
Combat Vehicle Cost
--------------------------------------------------------------------------------------------------------------------
Structural Cost 2,590,000.00
Weapons and Equipment Cost (+) 1,460,000.00 = 4,050,000.00
Combat Vehicle Cost Multiplier 1 + (100 / 100) (*) 2 = 8,100,000.00
--------------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 8,100,000.00
|