Cost Breakdown
Name/Model: Roughneck (Bolt v2)
Technology: Inner Sphere
Tonnage: 65
Configuration: Biped BattleMech
===============================================================================================================================
Structural Cost
-------------------------------------------------------------------------------------------------------------------------------
Armor (Standard): (200 pts) 12.5 x 10,000 125,000.00
Internal Structure (Endo Steel): 65 x 1,600 x 1 (+) 104,000.00 = 229,000.00
Myomer (Standard): 65 x 2,000 (+) 130,000.00 = 359,000.00
Engine (Light Fusion): (15,000 x 260 x 65) / 75 (+) 3,380,000.00 = 3,739,000.00
Gyro (Standard): 3.0 x 300,000 (+) 900,000.00 = 4,639,000.00
Cockpit (Standard): 200,000 (+) 200,000.00 = 4,839,000.00
Life Support: 50,000 (+) 50,000.00 = 4,889,000.00
Sensors: 65 x 2,000 (+) 130,000.00 = 5,019,000.00
Heat Sinks (Double): 10 x 6,000 (+) 60,000.00 = 5,079,000.00
Arm Actuators: 65 x ((100 x 2) + (50 x 2) + (80 x 2)) (+) 29,900.00 = 5,108,900.00
Leg Actuators: 65 x ((150 x 2) + (80 x 2) + (120 x 2)) (+) 45,500.00 = 5,154,400.00
-------------------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 5,154,400.00
===============================================================================================================================
Weapons and Equipment Cost
-------------------------------------------------------------------------------------------------------------------------------
ER Small Laser 11,250 11,250.00
ER Small Laser 11,250 (+) 11,250.00 = 22,500.00
ER Small Laser 11,250 (+) 11,250.00 = 33,750.00
LB 20-X AC 600,000 (+) 600,000.00 = 633,750.00
LB 20-X AC 600,000 (+) 600,000.00 = 1,233,750.00
LB 20-X AC (Ammo 5) [Cluster] [Empty Bin] 0 (+) 0.00 = 1,233,750.00
LB 20-X AC (Ammo 5) [Empty Bin] 0 (+) 0.00 = 1,233,750.00
LB 20-X AC (Ammo 5) [Empty Bin] 0 (+) 0.00 = 1,233,750.00
-------------------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 1,233,750.00
===============================================================================================================================
BattleMech Cost
-------------------------------------------------------------------------------------------------------------------------------
Structural Cost: 5,154,400.00
Weapons and Equipment Cost: (+) 1,233,750.00 = 6,388,150.00
BattleMech Cost Multiplier: 1 + (65 / 100) (*) 1.65 = 10,540,447.50
-------------------------------------------------------------------------------------------------------------------------------
Final BattleMech Cost 10,540,448.00
|