Cost Breakdown
Name/Model: Gurteltier-2 CCL
Technology: Inner Sphere
Tonnage: 100
Configuration: Tracked Combat Vehicle
=========================================================================================================
Structural Cost
---------------------------------------------------------------------------------------------------------
Armor (Heavy Ferro-Fibrous) (367 pts) 18.5 x 25,000 462,500.00
Internal Structure (Standard) 10.0 x 10,000 (+) 100,000.00 = 562,500.00
Control Components 5 x 10,000 (+) 50,000.00 = 612,500.00
Engine (XL) (20,000 x 300 x 100) / 75 (+) 8,000,000.00 = 8,612,500.00
Heat Sinks (Single) 10 x 2,000 (+) 20,000.00 = 8,632,500.00
Turret 3 x 5,000 (+) 15,000.00 = 8,647,500.00
---------------------------------------------------------------------------------------------------------
Total Structural Cost 8,647,500.00
=========================================================================================================
Weapons and Equipment Cost
---------------------------------------------------------------------------------------------------------
C3 Slave 250,000 250,000.00
CASE 50,000 (+) 50,000.00 = 300,000.00
ER Medium Laser 80,000 (+) 80,000.00 = 380,000.00
ER PPC 300,000 (+) 300,000.00 = 680,000.00
Gauss Rifle 300,000 (+) 300,000.00 = 980,000.00
Gauss Rifle (Ammo 8) [Empty Bin] 0 (+) 0.00 = 980,000.00
Gauss Rifle (Ammo 8) [Empty Bin] 0 (+) 0.00 = 980,000.00
Gauss Rifle (Ammo 8) [Empty Bin] 0 (+) 0.00 = 980,000.00
Guardian ECM Suite 200,000 (+) 200,000.00 = 1,180,000.00
MML 9 125,000 (+) 125,000.00 = 1,305,000.00
MML 9 (Ammo 11) [SRM] [Empty Bin] 0 (+) 0.00 = 1,305,000.00
MML 9 (Ammo 11) [SRM] [Empty Bin] 0 (+) 0.00 = 1,305,000.00
MML 9 (Ammo 13) [LRM] [Empty Bin] 0 (+) 0.00 = 1,305,000.00
MML 9 (Ammo 13) [LRM] [Empty Bin] 0 (+) 0.00 = 1,305,000.00
---------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 1,305,000.00
=========================================================================================================
Combat Vehicle Cost
---------------------------------------------------------------------------------------------------------
Structural Cost 8,647,500.00
Weapons and Equipment Cost (+) 1,305,000.00 = 9,952,500.00
Combat Vehicle Cost Multiplier 1 + (100 / 100) (*) 2 = 19,905,000.00
---------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 19,905,000.00
|