Cost Breakdown
Name/Model: Cataphract Assault Tank "Proxy"
Technology: Inner Sphere (Mixed)
Tonnage: 80
Configuration: Wheeled Combat Vehicle
================================================================================================================
Structural Cost
----------------------------------------------------------------------------------------------------------------
Armor (Laser Reflective) (272 pts) 17.0 x 30,000 510,000.00
Internal Structure (Standard) 8.0 x 10,000 (+) 80,000.00 = 590,000.00
Control Components 4 x 10,000 (+) 40,000.00 = 630,000.00
Engine (XXL) (100,000 x 380 x 80) / 75 (+) 40,533,333.33 = 41,163,333.33
Turret 2.5 x 5,000 (+) 12,500.00 = 41,175,833.33
----------------------------------------------------------------------------------------------------------------
Total Structural Cost 41,175,833.33
================================================================================================================
Weapons and Equipment Cost
----------------------------------------------------------------------------------------------------------------
AP Gauss Rifle (C) 10,000 10,000.00
AP Gauss Rifle (C) 10,000 (+) 10,000.00 = 20,000.00
AP Gauss Rifle (C) 10,000 (+) 10,000.00 = 30,000.00
AP Gauss Rifle (C) 10,000 (+) 10,000.00 = 40,000.00
AP Gauss Rifle (C) 10,000 (+) 10,000.00 = 50,000.00
AP Gauss Rifle (Ammo 40) [Empty Bin] (C) 0 (+) 0.00 = 50,000.00
LB 20-X AC (C) 600,000 (+) 600,000.00 = 650,000.00
LB 20-X AC (Ammo 5) [Empty Bin] (C) 0 (+) 0.00 = 650,000.00
Snub-Nose PPC 300,000 (+) 300,000.00 = 950,000.00
Targeting Computer (C) 5 x 10,000 (+) 50,000.00 = 1,000,000.00
----------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 1,000,000.00
================================================================================================================
Combat Vehicle Cost
----------------------------------------------------------------------------------------------------------------
Structural Cost 41,175,833.33
Weapons and Equipment Cost (+) 1,000,000.00 = 42,175,833.33
Combat Vehicle Cost Multiplier 1 + (80 / 200) (*) 1.4 = 59,046,166.67
----------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 59,046,167.00
|