Cost Breakdown
Name/Model: Highstorm Defender MK 1 HSD-1
Technology: Inner Sphere
Tonnage: 45
Configuration: Tracked Combat Vehicle
===============================================================================================================================
Structural Cost
-------------------------------------------------------------------------------------------------------------------------------
Armor (Heavy Ferro-Fibrous) (168 pts) 8.5 x 25,000 212,500.00
Internal Structure (Standard) 4.5 x 10,000 (+) 45,000.00 = 257,500.00
Control Components 2.5 x 10,000 (+) 25,000.00 = 282,500.00
Engine (XL) (20,000 x 225 x 45) / 75 (+) 2,700,000.00 = 2,982,500.00
-------------------------------------------------------------------------------------------------------------------------------
Total Structural Cost 2,982,500.00
===============================================================================================================================
Weapons and Equipment Cost
-------------------------------------------------------------------------------------------------------------------------------
Angel ECM Suite 750,000 750,000.00
CASE 50,000 (+) 50,000.00 = 800,000.00
Machine Gun 5,000 (+) 5,000.00 = 805,000.00
Machine Gun 5,000 (+) 5,000.00 = 810,000.00
Machine Gun (Ammo 100) [Empty Bin] 0 (+) 0.00 = 810,000.00
PPC 200,000 (+) 200,000.00 = 1,010,000.00
RISC Advanced Point Defense System 200,000 (+) 200,000.00 = 1,210,000.00
RISC Advanced Point Defense System 200,000 (+) 200,000.00 = 1,410,000.00
RISC Advanced Point Defense System (Ammo 12) [Empty Bin] 0 (+) 0.00 = 1,410,000.00
RISC Advanced Point Defense System (Ammo 12) [Empty Bin] 0 (+) 0.00 = 1,410,000.00
RISC Advanced Point Defense System (Ammo 12) [Empty Bin] 0 (+) 0.00 = 1,410,000.00
RISC Advanced Point Defense System (Ammo 12) [Empty Bin] 0 (+) 0.00 = 1,410,000.00
RISC Advanced Point Defense System (Ammo 12) [Empty Bin] 0 (+) 0.00 = 1,410,000.00
-------------------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 1,410,000.00
===============================================================================================================================
Combat Vehicle Cost
-------------------------------------------------------------------------------------------------------------------------------
Structural Cost 2,982,500.00
Weapons and Equipment Cost (+) 1,410,000.00 = 4,392,500.00
Combat Vehicle Cost Multiplier 1 + (45 / 100) (*) 1.45 = 6,369,125.00
-------------------------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 6,369,125.00
|