Cost Breakdown
Name/Model: Black Knight BL-6-KNT (Ian)
Technology: Inner Sphere
Tonnage: 75
Configuration: Biped BattleMech
=======================================================================================================================
Structural Cost
-----------------------------------------------------------------------------------------------------------------------
Armor (Ferro-Fibrous (Prototype)): (206 pts) 11.5 x 60,000 690,000.00
Internal Structure (Standard): 75 x 400 x 1 (+) 30,000.00 = 720,000.00
Myomer (Triple-Strength): 75 x 16,000 (+) 1,200,000.00 = 1,920,000.00
Engine (Fusion): (5,000 x 300 x 75) / 75 (+) 1,500,000.00 = 3,420,000.00
Gyro (Standard): 3.0 x 300,000 (+) 900,000.00 = 4,320,000.00
Cockpit (Standard): 200,000 (+) 200,000.00 = 4,520,000.00
Life Support: 50,000 (+) 50,000.00 = 4,570,000.00
Sensors: 75 x 2,000 (+) 150,000.00 = 4,720,000.00
Heat Sinks (Single): 2 x 2,000 (+) 4,000.00 = 4,724,000.00
Arm Actuators: 75 x ((100 x 2) + (50 x 2) + (80 x 2)) (+) 34,500.00 = 4,758,500.00
Leg Actuators: 75 x ((150 x 2) + (80 x 2) + (120 x 2)) (+) 52,500.00 = 4,811,000.00
-----------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 4,811,000.00
=======================================================================================================================
Weapons and Equipment Cost
-----------------------------------------------------------------------------------------------------------------------
Double Heat Sink (Prototype) 18,000 18,000.00
Double Heat Sink (Prototype) 18,000 (+) 18,000.00 = 36,000.00
Double Heat Sink (Prototype) 18,000 (+) 18,000.00 = 54,000.00
Hatchet 5 x 5,000 (+) 25,000.00 = 79,000.00
Large Laser 100,000 (+) 100,000.00 = 179,000.00
Large Laser 100,000 (+) 100,000.00 = 279,000.00
Medium Laser 40,000 (+) 40,000.00 = 319,000.00
Medium Laser 40,000 (+) 40,000.00 = 359,000.00
Medium Laser 40,000 (+) 40,000.00 = 399,000.00
Medium Laser 40,000 (+) 40,000.00 = 439,000.00
PPC 200,000 (+) 200,000.00 = 639,000.00
-----------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 639,000.00
=======================================================================================================================
BattleMech Cost
-----------------------------------------------------------------------------------------------------------------------
Structural Cost: 4,811,000.00
Weapons and Equipment Cost: (+) 639,000.00 = 5,450,000.00
BattleMech Cost Multiplier: 1 + (75 / 100) (*) 1.75 = 9,537,500.00
-----------------------------------------------------------------------------------------------------------------------
Final BattleMech Cost 9,537,500.00
|