Cost Breakdown
Name/Model: Barn Door BND-1
Technology: Inner Sphere
Tonnage: 200
Configuration: Superheavy Biped BattleMech
===================================================================================================================================
Structural Cost
-----------------------------------------------------------------------------------------------------------------------------------
Armor (Ferro-Fibrous): (600 pts) 33.5 x 20,000 670,000.00
Internal Structure (Endo Steel): 200 x 16,000 x 1 (+) 3,200,000.00 = 3,870,000.00
Myomer (Superheavy): 200 x 12,000 (+) 2,400,000.00 = 6,270,000.00
Engine (Light Fusion): (15,000 x 400 x 200) / 75 (+) 16,000,000.00 = 22,270,000.00
Gyro (Superheavy): 8.0 x 500,000 (+) 4,000,000.00 = 26,270,000.00
Cockpit (Superheavy): 300,000 (+) 300,000.00 = 26,570,000.00
Life Support: 50,000 (+) 50,000.00 = 26,620,000.00
Sensors: 200 x 2,000 (+) 400,000.00 = 27,020,000.00
Heat Sinks (Double): 20 x 6,000 (+) 120,000.00 = 27,140,000.00
Arm Actuators: 200 x ((100 x 2 x 2) + (50 x 0 x 2) + (80 x 0 x 2)) (+) 80,000.00 = 27,220,000.00
Leg Actuators: 200 x ((150 x 2 x 2) + (80 x 2 x 2) + (120 x 2 x 2)) (+) 280,000.00 = 27,500,000.00
-----------------------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 27,500,000.00
===================================================================================================================================
Weapons and Equipment Cost
-----------------------------------------------------------------------------------------------------------------------------------
C3 Slave 250,000 250,000.00
Gauss Rifle 300,000 (+) 300,000.00 = 550,000.00
Gauss Rifle (Ammo 8) [Empty Bin] 0 (+) 0.00 = 550,000.00
Gauss Rifle (Ammo 8) [Empty Bin] 0 (+) 0.00 = 550,000.00
Heavy PPC 250,000 (+) 250,000.00 = 800,000.00
Heavy PPC 250,000 (+) 250,000.00 = 1,050,000.00
RISC Heat Sink Override Kit 500 (+) 500.00 = 1,050,500.00
RISC Repeating TSEMP 1,200,000 (+) 1,200,000.00 = 2,250,500.00
Ultra AC/20 480,000 (+) 480,000.00 = 2,730,500.00
Ultra AC/20 480,000 (+) 480,000.00 = 3,210,500.00
Ultra AC/20 (Ammo 5) [Empty Bin] 0 (+) 0.00 = 3,210,500.00
Ultra AC/20 (Ammo 5) [Empty Bin] 0 (+) 0.00 = 3,210,500.00
Ultra AC/20 (Ammo 5) [Empty Bin] 0 (+) 0.00 = 3,210,500.00
Ultra AC/20 (Ammo 5) [Empty Bin] 0 (+) 0.00 = 3,210,500.00
Ultra AC/20 (Ammo 5) [Empty Bin] 0 (+) 0.00 = 3,210,500.00
Ultra AC/20 (Ammo 5) [Empty Bin] 0 (+) 0.00 = 3,210,500.00
Ultra AC/20 (Ammo 5) [Empty Bin] 0 (+) 0.00 = 3,210,500.00
-----------------------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 3,210,500.00
===================================================================================================================================
BattleMech Cost
-----------------------------------------------------------------------------------------------------------------------------------
Structural Cost: 27,500,000.00
Weapons and Equipment Cost: (+) 3,210,500.00 = 30,710,500.00
BattleMech Cost Multiplier: 1 + (200 / 100) (*) 3.00 = 92,131,500.00
-----------------------------------------------------------------------------------------------------------------------------------
Final BattleMech Cost 92,131,500.00
|