Cost Breakdown
Name/Model: Orko
Technology: Clan (Mixed)
Tonnage: 70
Configuration: Wheeled Combat Vehicle
================================================================================================================
Structural Cost
----------------------------------------------------------------------------------------------------------------
Armor (Heavy Ferro-Fibrous) (285 pts) 14.5 x 25,000 362,500.00
Internal Structure (Standard) 7.0 x 10,000 (+) 70,000.00 = 432,500.00
Control Components 3.5 x 10,000 (+) 35,000.00 = 467,500.00
Engine (Fuel Cell) (3,500 x 260 x 70) / 75 (+) 849,333.33 = 1,316,833.33
Heat Sinks (Single) 1 x 2,000 (+) 2,000.00 = 1,318,833.33
Turret 2 x 5,000 (+) 10,000.00 = 1,328,833.33
----------------------------------------------------------------------------------------------------------------
Total Structural Cost 1,328,833.33
================================================================================================================
Weapons and Equipment Cost
----------------------------------------------------------------------------------------------------------------
CASE 1 x 50,000 50,000.00
ECM Suite 200,000 (+) 200,000.00 = 250,000.00
LB 10-X AC 400,000 (+) 400,000.00 = 650,000.00
LB 10-X AC (Ammo 10) [Cluster] [Empty Bin] 0 (+) 0.00 = 650,000.00
LB 10-X AC (Ammo 10) [Empty Bin] 0 (+) 0.00 = 650,000.00
Light Active Probe 150,000 (+) 150,000.00 = 800,000.00
Rotary AC/5 275,000 (+) 275,000.00 = 1,075,000.00
Rotary AC/5 (Ammo 20) [Empty Bin] 0 (+) 0.00 = 1,075,000.00
Rotary AC/5 (Ammo 20) [Empty Bin] 0 (+) 0.00 = 1,075,000.00
Rotary AC/5 (Ammo 20) [Empty Bin] 0 (+) 0.00 = 1,075,000.00
----------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 1,075,000.00
================================================================================================================
Combat Vehicle Cost
----------------------------------------------------------------------------------------------------------------
Structural Cost 1,328,833.33
Weapons and Equipment Cost (+) 1,075,000.00 = 2,403,833.33
Combat Vehicle Cost Multiplier 1 + (70 / 200) (*) 1.35 = 3,245,175.00
----------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 3,245,175.00
|