Cost Breakdown
Name/Model: Diggs Drone Control Tank
Technology: Inner Sphere
Tonnage: 35
Configuration: Wheeled Combat Vehicle
===============================================================================================================
Structural Cost
---------------------------------------------------------------------------------------------------------------
Armor (Heavy Ferro-Fibrous) (148 pts) 7.5 x 25,000 187,500.00
Internal Structure (Standard) 3.5 x 10,000 (+) 35,000.00 = 222,500.00
Control Components 2 x 10,000 (+) 20,000.00 = 242,500.00
Engine (Light Fusion) (15,000 x 190 x 35) / 75 (+) 1,330,000.00 = 1,572,500.00
Turret 0.5 x 5,000 (+) 2,500.00 = 1,575,000.00
---------------------------------------------------------------------------------------------------------------
Total Structural Cost 1,575,000.00
===============================================================================================================
Weapons and Equipment Cost
---------------------------------------------------------------------------------------------------------------
Angel ECM Suite 750,000 750,000.00
CASE 50,000 (+) 50,000.00 = 800,000.00
Chassis Modification, Fully Amphibious 3.5 x 10,000 (+) 35,000.00 = 835,000.00
Drone Carrier Control System (4 drones) 4 x 10,000 (+) 40,000.00 = 875,000.00
ER Medium Laser 80,000 (+) 80,000.00 = 955,000.00
Light Machine Gun 5,000 (+) 5,000.00 = 960,000.00
Light Machine Gun 5,000 (+) 5,000.00 = 965,000.00
Light Machine Gun (Ammo 100) [Empty Bin] 0 (+) 0.00 = 965,000.00
---------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 965,000.00
===============================================================================================================
Combat Vehicle Cost
---------------------------------------------------------------------------------------------------------------
Structural Cost 1,575,000.00
Weapons and Equipment Cost (+) 965,000.00 = 2,540,000.00
Combat Vehicle Cost Multiplier 1 + (35 / 200) (*) 1.175 = 2,984,500.00
---------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 2,984,500.00
|